One package per supplier quote or trade, for example DAIKIN FCU or Lighting. Each has its own kits, handovers and reports.
Make your first package
A package holds one supplier quote or trade: its kits, the areas they go to, every handover and its signed report. Drop a schedule or quote on the box below, or click it to choose the file. Or type the package in by hand and upload its file later.
Nothing to pick yet
When a Planner publishes a package, it shows here with its kits, ready for picking.
No packages match this search or filter.
Delivery dates
When each kit is needed on site: its own date, or the package's date. Soonest first.
Handovers
Every handover made from this package, with its status and signed report. A new handover only includes what was picked since the last one.
Tracking
For each code: quoted, picked, handed over, and still to hand over.
No materials match this filter.
Upload a file to build your kits
Upload a supplier quote as PDF, or a material list as Excel or CSV. Each group in the file (FCU01, FCU02 and so on) becomes a kit, and each quantity becomes a pick target. Prices are never read in.